Open the Order in Graphical Scheduler.
Right- click date header > select required Date range to display Labor Position as per EWT.
Click and drag the Labor Position and drop it in the Crew section for the respective crew as shown in Figure 1.0
The Crew is assigned to the Labor Position as shown in Figure 1.1.

